Work Progress Aug 5-8

On Monday, the media line to the multipurpose building was laid and covered and the well house walls were started.  On Tuesday, the well was connected to plastic pipe and water was pumped out for 5 hours.  Also, the walls to the well house were finished.  On Wednesday, the  well house rafters were set and covered with a tarp. The electrical wiring was hung in the tent.  Both tents were reinforced and tightened with extra straps. Camping areas were made in the trees.  Bicycles were purchased for use at the camp.